Port structures · North-West Russia · 2024
Berth complex reconstruction
Reconstruction of a berth complex with dredging and restoration of the quay wall load-bearing structures.
Key factsDesign · Construction · Dredging
420 mBerth length
180,000 m³Dredging volume
14 mo.Duration
Task
Restore the bearing capacity of the quay wall and ensure design depths at the berth without halting port operation.
Result
The berth was returned to operation with design characteristics and safe depths at the wall.
The key stage was delivered ahead of schedule.
The facility required restoring the operational characteristics of the berth while keeping the port in operation. Works were phased around navigation and weather windows.
ARCON delivered the full cycle: survey, design solutions, dredging and civil works, including the underwater part.